Library

@ Journals

H.Suzuki et al., "Formation of a single-bunch beam in the booster synchrotron at SPring-8", Nucl. Instr. Meth. A444 (2000) 515

H.Suzuki et al., "508.58MHz synchronous universal counter for beam control system of SPring-8", Nucl. Instr. Meth. A431 (1999) 294

T.Aoki et al., "Beam Position Monitor for the Spring-8 Synchrotron", Synchrotron Radiation Instrumentation '95, Rev. Sci. Instrum. 67 9 (1996) 3367

H.Yonehara et al., "Magnet System of Spring-8 Booster Synchrotron", Synchrotron Radiation Instrumentation '95, Rev. Sci. Instrum. 67 9 (1996)

H.Suzuki et al., "Status of the booster Synchrotron for SPring-8", Rev. Sci. Instrum. 66 (1995) 1964
 

@ Proceedings

N.Hosoda et al., "Reconfigurable Timing Controller using PLDs", Proc. ICALEPCS2003, Gyeongju, Korea, (2003) 13 Oct.

T.Aoki et al., "Bunched Beam Cleaning System of SPring-8 Booster Synchrotron", Proc. PAC2003, Portland, USA, (2003) 12 May.

K.Fukami et al., "Ejected Beam Emittance of the SPring-8 Booster Synchrotron", Proc. EPAC2002, Paris, (2002) 3 June.

  N. Hosoda et. al., "Timing System of SPring-8 Booster Synchrotron", ICALEPCS 2001, San Jose, CA, USA, Nov 2001

K.Fukami et al., "Beam Orbit, Tune and Chromaticity in the SPring-8 Booster Synchrotron", Proc. EPAC2000, Vienna, (2000) 26 June.

T.Aoki et al., "Tune Measurement of the SPring-8 synchrotron", Proc. 12th Symp. Accel. Sci. Technol., Wako, Japan, (1999) 531

N.Hosoda et al., "Integration of the Booster Synchrotron Control System to the SPring-8 Control System", Proc. ICALEPCS'99, Trieste, Italy, (1999)

K.Fukami et al., "Magnet Alignment of SPring-8 Booster Synchrotron", 5th International Workshop on Accelerator Alignment, Chicago, (1997)

H.Suzuki et al., "Timing system of Spring-8", Proc. 11th Symp. Accel. Sci. Technol., Harima Science Garden City, (1997) 80

T.Aoki et al., "Beam diagnostics for beam commissioning of SPring-8 synchrotron", Proc. 11th Symp. Accel. Sci. Technol., Harima Science Garden City, (1997) 246

T.Abe et al., "Magnetic leakage shield of septum magnet for SPring-8 synchrotron", Proc. 11th Symp. Accel. Sci. Technol., Harima Science Garden City, (1997) 405

N.Tani et al., "Control system for beam commissioning of the SPring-8 synchrotron", Proc. 11th Symp. Accel. Sci. Technol., Harima Science Garden City, (1997) 467

N.Hosoda et al., "Orbit Collection at Spring-8 Synchrotron", Proc. 11th Symp. Accel. Sci. Technol., Harima Science Garden City, (1997) 499

H.Suzuki et al., "Beam commissioning of the SPring-8 synchrotron" to be published in Proc. 6th International Conference on SRI97 (1997)

N.Tani et al., "Control System for the Booster Synchrotron of SPring-8", Proc. Int. Workshop on Control Systems for Small- and Medium-Scale Accelerators, Tsukuba, (1996)

K.Fukami et al., "Power Supplies of Lattice Magnets for SPring-8 Synchrotron", Proc. 2nd Symposium on Power Supply Technology for Accelerators, Tanashi, (1996) (in Japanese)

H.Suzuki et al., "High Accurate Timing System for the Spring-8 Synchrotron", Proc. 10th Symp. Accel. Sci. Technol., Hitachinaka, (1995) 295

T.Aoki et al., "Calibration of Beam Position Monitor for the Spring-8 Synchrotron", Proc. 10th Symp. Accel. Sci. Technol., Hitachinaka, (1995) 251

K.Fukami et al., "Manufacture and Arrangement of Bending Magnets of SPring-8 Synchrotron", Proc. 10th Symp. Accel. Sci. Technol., Hitachinaka, (1995) 209

K.Fukami et al., "Alignment of Magnets for the Spring-8 Synchrotron", Proc. 10th Symp. Accel. Sci. Technol., Hitachinaka, (1995) 103

H.Suzuki et al., "Status of the Booster Synchrotron for Spring-8", Proc. SRI94

H.Suzuki et al., "Characteristics of RF Reference and Timing Signal Distribution for SPring-8", Proc. 9th Symp. Accel. Sci. Technol., Tsukuba, (1993) 252

H.Yonehara et al., "Synchrotron of Spring-8", Proc. 1993 Part. Accel. Conf., Washington D.C., (1993) 2039

H.Suzuki et al., "High Power Test of RF Cavity for SPring-8 Booster Synchrotron", Proc. 8th Symp. Accel. Sci. Technol., Saitama, (1991) 113

H.Suzuki et al., "Development of 5-cell RF cavity for SPring-8 Booster Synchrotron", Proc. 1991 Part. Accel. Conf., San Francisco, (1991)
 

@ Anual Reports

K. Fukami et al.,  "Measurement of Beam Energy Loss in the SPring-8 Synchrotron", (1999) 126

K. Fukami et al.,  "Magnet Level Survey in the SPring-8 Synchrotron", (1999) 128

K. Fukami et al.,  "Continuous Measurement of Output Flutuation of Power Supplies for Lattice Magnets in the SPring-8 Synchrotron", (1999) 130

N.Hosoda et al., "Integration of the Synchrotron Control System to the SPring-8 Control System", (1998) 118

H.Yonehara et al., "SPring-8 Synchrotron", (1997) 18

H.Suzuki et al., "Several-bunch Beam-operation of SPring-8", (1997) 160

K.Fukami et al., "Estimation of Alignment Accuracy of the SPring-8 Synchrotron", (1997) 162

H.Yonehara et al., "Synchrotron", (1996) 12

H.Suzuki et al., "Conditioning of RF Cavities for the Spring-8 Synchrotron", (1996) 135

K.Fukami et al., "Power Supplies for Lattice Magnets of the Spring-8 Synchrotron", (1996) 137

T.Aoki et al., "Beam Diagnostics for the Commissioning of Spring-8 Synchrotron", (1996) 139

N.Hosoda et al., "Synchrotron Control System", (1996) 141

N.tani et al., "Construction of the Control System for the Spring-8 Synchrotron", (1996) 143

H.Yonehara et al., "Status of SPring-8 Synchrotron", (1995) 15

K.Fukami et al., "Magnet System of SPring-8 Booster Synchrotron", (1995) 101

H.Yonehara et al., "Development of the Pulse Magnets for the Booster Synchrotron of SPring-8", (1995) 193

K.Fukami et al., "Alignment of Magnets for the SPring-8 Synchrotron", (1995) 105

T.Aoki et al., "Calibration of Beam Position Monitor for the SPring-8 Synchrotron", (1995) 107

H.Suzuki et al., "High Accurate Timing System for the Spring-8 Synchrotron", (1995) 109

H.Yonehara et al., "Synchrotron", (1994) 19

T.Aoki et al., "Beam Position Monitor for the SPring-8 Synchrotron", (1994) 102

H.Abe et al., "Development of Septum Magnets for the SPring-8 Synchrotron", (1994) 104

H.Suzuki et al., "Characteristics of RF Reference and Timing Signal Distribution for SPring-8", (1994) 105

N.Tani et al., "Development of the Kicker Magnet for Beam Extraction", (1994) 107

K.Fukami et al., "Measurement of Magnetic Field Distribution of the Dipole, Quadrupole, Sextupole Magnets for the SPring-8 Synchrotron", (1994) 109
 

@ Others

Y. Kawashima , "Beam Control System of SPring-8", SPring-8 User Information Rep. Vol.4 No.3 P4 May (1999) (in Japanese)

H. Suzuki et al., "Status of Several bunches Mode Operation report by accelerator division", SPring-8 User Information Rep. Vol.3 No.2 P1 March (1998) (in Japanese)

H.Suzuki et al., "Transmission Test of the Timing Sugnal for the Spring-8", RIKEN Accel. Prog. Rep. 27 (1993)

S.Yoneyama et al., "Dezign Study of the Vacuum System for the Spring-8 Synchrotron", JAERI-memo 05-161 (1993) (In Japanese)

H.Yonehara et al., "Beam-Transport System from the Synchrotron to the Storage Ring in Spring-8", JAERI-memo 04-307 (1992) (in Japanese)

H.Yonehara et al., "Design of the Booster Synchrotron for SPring-8 and its Related Facility", JAERI-memo 04-289 (1992) (in Japanese)

H.Suzuki et al., "High Power Test of a Five-cell Cavity for the Spring-8", RIKEN Accel. Prog. Rep. 25 (1991)

H.Yonehara et al., "Design Study of the Beam-transport System from the Synchrotron to the Storage Ring for the Large Synchrotron Radiation Facility (SPring-8) and its Related facilities (II)", JAERI-memo 03-3867 (1991) (in Japanese)

H.Yonehara et al., "Design Study of the Booster Synchrotron for the Large Synchrotron Radiation Facility (SPring-8) and its Related Facilities (II)", JAERI-memo 03-352 (1991) (in Japanese)



hosoda