5th cycle in 2005



 
 
 
 
filling period use comments
- 14-Jun-05 14-Jun-05 machine tuning -
11bunches train * 29 14-Jun-05 -23-Jun-05 user -
18 + 2/21- -23-Jun-05 -2-Jul-05 -user -
---- -2-Jul-05 -4-Jul-05 -study -
18 + 2/21- -4-Jul-05 -17-Jul-05 -user -
203- -7-Jul-05 -1-Aug-05 -user -
-- -1-Aug-05 -5-Aug-05 -tuning/study -

 

  • Trouble in klystron power supply at D station was occured on Jul. 29. The current was reduced from 100mA to 80mA.

  •  
    Last modified: May. 13 2005